The Common Arrangement of Work Sections (CAWS) was developed by the Construction Project Information Committee (CPIC), a pan-industry organisation with representatives from key industry institutes.
It was developed as a result of research demonstrating that the quality of construction information was a very significant determinant of the quality of construction. It was recognised that standardisation of the way production information was created and classified could help improve quality, and that the commonly used CISfb classification was not sufficiently comprehensive to achieve this.
CAWS established a consistent arrangement for specifications and bills of quantities. It was first published in 1987 and was updated by CPIC in 1998 to align it with the Unified Classification for the Construction Industry (Uniclass). In 2005 nbs submitted to CPIC, modifications to the services sections of CAWS for consideration and following 5 years of consultation these changes were accepted.
CAWS is the categorisation of work that is used for the National Building Specification (NBS – which before 1987 followed the CISfB structure), National Engineering Specification (NES), the Standard Method of Measurement, currently in its 7th Edition (SMM7) and a number of industry pricing books such as Spons, Laxtons and Wessex.
CAWS has since been incorporated into Table J of Uniclass, which was also developed by CPIC. Uniclass is a classification system for organising library materials, product literature and project information.
In 2011, the CPIC used the nbs proposals for re-classification of the work sections in CAWS and Uniclass Table J as the basis of a consultation process for revising Uniclass. This development of Uniclass as a whole is considered to better accommodate civil engineering and process engineering alongside architecture and landscape, it also better enables the description of systems in performance terms, and is more suited to accommodating facilities management.
The main categories are:
- A - Preliminaries
- B - Complete buildings / structures / units
- C - Demolition / Alteration /Renovation
- D - Groundwork
- E - In situ concrete / Large precast concrete
- F - Masonry
- G - Structural / Carcassing metal / timber
- H - Cladding / Covering
- J - Waterproofing
- K - Linings / Sheathing / Dry partitioning
- L - Windows / Doors / Stairs
- M - Surface finishes
- N - Furniture / Equipment
- P - Building fabric sundries
- Q - Paving / Planting / Fencing / Site furniture
- R - Disposal Systems
- S - Piped supply systems
- T - Mechanical heating / Cooling / Refrigeration systems
- U - Ventilation / Air conditioning systems
- V - Electrical supply / power / lighting systems
- W - Communications / Security / Control systems
- X - Transport systems
- Y - General Engineering Services
- Z - Building fabric reference specification
Each section includes further sub-classification and offers detailed information and supplementary rules. For more information see: Common arrangement of work sections classification.
NB: SMM7 has been replaced by the New Rules of Measurement (NRM) which has moved away from CAWS, to adopt its own system of indexing. See New Rules of Measurement for more information.
[edit] Related articles on Designing Buildings
- Bills of quantities.
- BIM classification.
- CI/SfB.
- Classification, an introduction.
- Common arrangement of work sections classification.
- Comparison of SMM7 with NRM2.
- Construction Project Information Committee.
- Elemental cost plan.
- How to take off construction works.
- New Rules of Measurement.
- Preliminaries.
- Production information.
- Specifications.
- Spot items.
- Standard Method of Measurement (SMM7).
- Sundry items.
- Uniclass.
- Work section.
[edit] External references
- CPIC.
- NBS.
- NBS article on CAWS reclassification.
- NBS article on Co-ordinating CAWS and NRM.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.